0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Investigations on a degraded suspension bridge: damage characterization and rehabilitation

 Investigations on a degraded suspension bridge: damage characterization and rehabilitation
Autor(en): , ,
Beitrag für IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, veröffentlicht in , S. 1-8
DOI: 10.2749/222137813808626885
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

This paper describes the experimental investigations and the planned rehabilitation programme of Teil Bridge in France. Soon after the sudden rupture of a cable near the anchorage, the bridge was c...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Veröffentlicht in:
Seite(n): 1-8 Anzahl der Seiten (im PDF): 8
Seite(n): 1-8
Anzahl der Seiten (im PDF): 8
Jahr: 2013
DOI: 10.2749/222137813808626885
Abstrakt:

This paper describes the experimental investigations and the planned rehabilitation programme of Teil Bridge in France. Soon after the sudden rupture of a cable near the anchorage, the bridge was closed to traffic. Inspections were carried out to understand the sources of this event and to assess the performance of cables and strand sockets. Prior to rehabilitation, the bridge safety was improved by strengthening each socket; the bridge was then re-opened to pedestrians and cyclists only. An acoustic emission system was installed during a full year period; events related to cable ruptures were accordingly monitored. Meanwhile, several other experimental investigations on steel and concrete materials (resilience, tensile steel strength, carbonation and chloride ingresses) were led to estimate the residual structural service life of the bridge and to plan repair actions. A major rehabilitation program was then scheduled with the change of all cables and sockets. This paper presents the different stages of these investigations and the rehabilitation process.

Stichwörter:
Schallemission Hängebrücke Verstärkung Instandsetzung

Bauwerkstypen