0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The hyperion tower, an audacious demonstration of the use of materials

The hyperion tower, an audacious demonstration of the use of materials
Auteur(s): , , , ,
Présenté pendant IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, publié dans , pp. 1144-1152
DOI: 10.2749/ghent.2021.1144
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

With a total height of 55m, the Hyperion residential Tower is located near the Saint Jean train Station in Bordeaux France and was designed by the engineering firm Terrell in association with the a...
Lire plus

Détails bibliographiques

Auteur(s): (Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Eiffage, Bordeaux, FRANCE Philippe Bontemps Terrell, Toulouse, FRANCE‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Publié dans:
Page(s): 1144-1152 Nombre total de pages (du PDF): 9
Page(s): 1144-1152
Nombre total de pages (du PDF): 9
DOI: 10.2749/ghent.2021.1144
Abstrait:

With a total height of 55m, the Hyperion residential Tower is located near the Saint Jean train Station in Bordeaux France and was designed by the engineering firm Terrell in association with the architectural practice Jean-Paul Viguier & Associates. The structure is braced with a reinforced concrete core, made of cross laminated timber floors, laminated timber beams along the periphery of the building, wood frame walls on the façades, and prefabricated steel balconies placed in situ with cranes. Detailed design of the composite tower was carried out by engineering firm Setec Tpi, through a large use of BIM software’s (Revit and Tekla) from which shop drawings were generated. The main contractor Eiffage had to face many challenges during construction to erect what is now the tallest wooden tower in France.

Mots-clé:
acier béton bois tour BIM
Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
License:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.