0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The hyperion tower, an audacious demonstration of the use of materials

The hyperion tower, an audacious demonstration of the use of materials
Autor(en): , , , ,
Beitrag für IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, veröffentlicht in , S. 1144-1152
DOI: 10.2749/ghent.2021.1144
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

With a total height of 55m, the Hyperion residential Tower is located near the Saint Jean train Station in Bordeaux France and was designed by the engineering firm Terrell in association with the a...
Weiterlesen

Bibliografische Angaben

Autor(en): (Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Setec tpi, Paris, France)
(Eiffage, Bordeaux, FRANCE Philippe Bontemps Terrell, Toulouse, FRANCE‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Veröffentlicht in:
Seite(n): 1144-1152 Anzahl der Seiten (im PDF): 9
Seite(n): 1144-1152
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/ghent.2021.1144
Abstrakt:

With a total height of 55m, the Hyperion residential Tower is located near the Saint Jean train Station in Bordeaux France and was designed by the engineering firm Terrell in association with the architectural practice Jean-Paul Viguier & Associates. The structure is braced with a reinforced concrete core, made of cross laminated timber floors, laminated timber beams along the periphery of the building, wood frame walls on the façades, and prefabricated steel balconies placed in situ with cranes. Detailed design of the composite tower was carried out by engineering firm Setec Tpi, through a large use of BIM software’s (Revit and Tekla) from which shop drawings were generated. The main contractor Eiffage had to face many challenges during construction to erect what is now the tallest wooden tower in France.

Stichwörter:
Stahl Beton Verbund Holz Turm Vorfertigung BIM Hybrid
Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.