Hong Kong-Zhuhai-Macao Bridge, Hong Kong Special Administrative Region (HKSAR): Design and construction of 9km of precast segmental twin deck bridges

 Hong Kong-Zhuhai-Macao Bridge, Hong Kong Special Administrative Region (HKSAR): Design and construction of 9km of precast segmental twin deck bridges
Auteur(s): ,
Présenté pendant IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, publié dans , pp. 1830-1837
DOI: 10.2749/222137814814068337
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.38 MB

The Hong Kong-Zhuhai-Macao Bridge is a 9 km long dual 3-lane road viaduct, which is the Hong Kong part of a 30km long fixed link from Hong Kong to Macao and Zhuhai. This project had been awarded b...
Lire plus

Détails bibliographiques

Auteur(s):

Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Publié dans:
Page(s): 1830-1837 Nombre total de pages (du PDF): 8
Page(s): 1830-1837
Nombre total de pages (du PDF): 8
Année: 2014
DOI: 10.2749/222137814814068337
Abstrait:

The Hong Kong-Zhuhai-Macao Bridge is a 9 km long dual 3-lane road viaduct, which is the Hong Kong part of a 30km long fixed link from Hong Kong to Macao and Zhuhai. This project had been awarded by Highway Department of Hong Kong to a Joint Venture formed by Dragages Hong Kong, China Harbour Engineering Company and VSL Hong Kong in 2012 as a design/build type contract. The work is presently ongoing and is scheduled to be completed by 2016.

The viaduct provides the link from the Scenic Hill next to Hong Kong's International Airport on Chek Lap Kok Island to HKSAR's border with China in the Pearl River Delta.

This presentation focuses on the design and construction aspects of the viaduct, whose entire deck is made up of precast segments to cope with high durability requirements, the offshore nature of the project and a tight construction schedule.