Finding the link between visual inspection and key performance indicators for road bridges

 Finding the link between visual inspection and key performance indicators for road bridges
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 737-744
DOI: 10.2749/guimaraes.2019.0737
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.69 MB

Based on the rating from visual inspection and proposed weighting through component, system and network level, assessment procedure resulting with set of six most important Key Performance Indicato...
Lire plus

Détails bibliographiques

Auteur(s): (University of Zagreb, Faculty of Civil Engineering, Department for Structures, Zagreb, Croatia)
(University of Zagreb, Faculty of Civil Engineering, Department for Structures, Zagreb, Croatia)
(University of Zagreb, Faculty of Civil Engineering, Department for Structures, Zagreb, Croatia)
(University of Zagreb, Faculty of Civil Engineering, Department for Structures, Zagreb, Croatia)
(University of Zagreb, Faculty of Civil Engineering, Department for Structures, Zagreb, Croatia)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 737-744 Nombre total de pages (du PDF): 8
Page(s): 737-744
Nombre total de pages (du PDF): 8
DOI: 10.2749/guimaraes.2019.0737
Abstrait:

Based on the rating from visual inspection and proposed weighting through component, system and network level, assessment procedure resulting with set of six most important Key Performance Indicators (KPI) for road bridges is presented. Those are: bridge condition assessment, structural safety, traffic safety, durability indicator, availability and bridge importance in the network. KPIs organised in the radar shaped diagram serve for priority repair ranking decisions. The procedure is elaborated at the sample of five actual bridges: two reinforced concrete arch bridges, one with solid and other with hollowed cross-sections; one frame type bridge with V shaped piers; one precast slab overpass; one solid slab continuous bridge with Y type piers. Bridges are built between 1958 and 2001 and are located either at the state or at the local roads in Croatia. Spans are varying from

9.5 to 72 m and overall lengths from 22 to 120 m.

Mots-clé:
pont