Fast Tracking the Pulau Poh Cable-stayed Bridge

 Fast Tracking the Pulau Poh Cable-stayed Bridge
Auteur(s): , ,
Présenté pendant IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, publié dans , pp. 601-608
DOI: 10.2749/kualalumpur.2018.0601
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.1 MB

The construction of the Pulau Poh cable-stayed bridge has been challenging both technically and environmentally. The curved pylon shape in two planes, with changing cross section and heavily conges...
Lire plus

Détails bibliographiques

Auteur(s): (BBR Construction Systems (M) Sdn. Bhd., Selangor, Malaysia)
(BBR Construction Systems (M) Sdn. Bhd., Selangor, Malaysia)
(SCE Consultants Sdn. Bhd., Selangor, Malaysia)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Publié dans:
Page(s): 601-608 Nombre total de pages (du PDF): 8
Page(s): 601-608
Nombre total de pages (du PDF): 8
DOI: 10.2749/kualalumpur.2018.0601
Abstrait:

The construction of the Pulau Poh cable-stayed bridge has been challenging both technically and environmentally. The curved pylon shape in two planes, with changing cross section and heavily congested reinforcement pose constructability concerns. Accurate geometry control and positioning of stay cable anchorages within the pylon is crucial to ensure the bridge meets its intended design life. Located in an area with high rainfall intensity presents additional environmental challenges, where working areas are constantly submerged. To address the challenges and meet the project deadline, innovative construction methodologies are being adopted. The bridge design was also revisited, taking into consideration the construction approach. This paper aims to explain the challenges faced and methods used to fast track the construction of the Pulau Poh cable-stayed bridge.

Mots-clé:
esthétique Pont à haubans BIM