Expansion joint replacement using the system to minimise impacts on traffic
|
Détails bibliographiques
Auteur(s): |
Thomas Spuler
(Mageba SA, Bulach, Switzerland)
Colm O'Suilleabhain (Mageba SA, Bulach, Switzerland) Gianni Moor (Mageba USA, New York, USA) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016 | ||||
Publié dans: | IABSE Congress Stockholm, 2016 | ||||
|
|||||
Page(s): | 1724-1731 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2016 | ||||
DOI: | 10.2749/stockholm.2016.1720 | ||||
Abstrait: |
TheMini-Fly-Overapproach to expansion joint replacement in road bridges can help minimise the impact on traffic of such work. It involves the construction of a temporary sliding plate expansion joint across the expansion joint location, which enables traffic to cross the worksite when required due to high traffic volumes but allows demolition, reconstruction and installation work to proceed at other times – e.g. at night-time or weekends. The use of the approach in the replacement of various types of expansion joint is presented, demonstrating its versatility and usefulness as a highly effective method of traffic management. |
||||
Mots-clé: |
Joint de dilatation
|