0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Expansion joint replacement using the system to minimise impacts on traffic

 Expansion joint replacement using the system to minimise impacts on traffic
Autor(en): , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1724-1731
DOI: 10.2749/stockholm.2016.1720
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.23 MB

TheMini-Fly-Overapproach to expansion joint replacement in road bridges can help minimise the impact on traffic of such work. It involves the construction of a temporary sliding plate expans...
Weiterlesen

Bibliografische Angaben

Autor(en): (Mageba SA, Bulach, Switzerland)
(Mageba SA, Bulach, Switzerland)
(Mageba USA, New York, USA)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1724-1731 Anzahl der Seiten (im PDF): 8
Seite(n): 1724-1731
Anzahl der Seiten (im PDF): 8
Jahr: 2016
DOI: 10.2749/stockholm.2016.1720
Abstrakt:

TheMini-Fly-Overapproach to expansion joint replacement in road bridges can help minimise the impact on traffic of such work. It involves the construction of a temporary sliding plate expansion joint across the expansion joint location, which enables traffic to cross the worksite when required due to high traffic volumes but allows demolition, reconstruction and installation work to proceed at other times – e.g. at night-time or weekends. The use of the approach in the replacement of various types of expansion joint is presented, demonstrating its versatility and usefulness as a highly effective method of traffic management.

Stichwörter:
Erneuerung Fahrbahnübergangskonstruktion (FÜK)