Design and construction of a flyover for the SAAR Interchange in Bahrain
|
Détails bibliographiques
Auteur(s): |
Francesco Presta
(BG&E)
Joe Turner (BG&E) Kashif Rasheed (BG&E) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022 | ||||
Publié dans: | IABSE Symposium Prague 2022 | ||||
|
|||||
Page(s): | 1738-1746 | ||||
Nombre total de pages (du PDF): | 9 | ||||
DOI: | 10.2749/prague.2022.1738 | ||||
Abstrait: |
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the widening and improvement of the two highways included their junction, known as the SAAR Interchange, with an additional grade separated left turn ramp designed to link the southbound SKBSH onto the eastbound SIBSH. The ramp comprised a 515m long flyover built using the incremental launch method (ILM). This paper gives an overview of the detailed design and discusses the specific aspects of the construction method employed. |
||||
Mots-clé: |
Poussage caisson
|
||||
Copyright: | © 2022 International Association for Bridge and Structural Engineering (IABSE) | ||||
License: | Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits. |