Design and construction of a flyover for the SAAR Interchange in Bahrain
|
Bibliografische Angaben
Autor(en): |
Francesco Presta
(BG&E)
Joe Turner (BG&E) Kashif Rasheed (BG&E) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022 | ||||
Veröffentlicht in: | IABSE Symposium Prague 2022 | ||||
|
|||||
Seite(n): | 1738-1746 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
DOI: | 10.2749/prague.2022.1738 | ||||
Abstrakt: |
The Shaikh Khalifa Bin Salman Highway (SKBSH) and Shaikh Isa Bin Salman Highway (SIBSH) are two of the most important arterial roads of the Kingdom of Bahrain. The project for the widening and improvement of the two highways included their junction, known as the SAAR Interchange, with an additional grade separated left turn ramp designed to link the southbound SKBSH onto the eastbound SIBSH. The ramp comprised a 515m long flyover built using the incremental launch method (ILM). This paper gives an overview of the detailed design and discusses the specific aspects of the construction method employed. |
||||
Stichwörter: |
Taktschiebeverfahren Hohlkasten
|
||||
Copyright: | © 2022 International Association for Bridge and Structural Engineering (IABSE) | ||||
Lizenz: | Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden. |