0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A curved footbridge with hidden extras

A curved footbridge with hidden extras
Auteur(s): , ,
Présenté pendant IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, publié dans , pp. 1995-2000
DOI: 10.2749/newyork.2019.1995
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.47 MB

For improved safety and ease of travel for pedestrians and cyclists across the busy 4-lane main road Breidholtsbraut in the suburb of Breidholt in Reykjavik, Iceland, the Icelandic Road and Coastal...
Lire plus

Détails bibliographiques

Auteur(s): (EFLA Consulting Engineers)
(Icelandic Road and Coastal Administration (IRCA))
(Studio Granda)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Publié dans:
Page(s): 1995-2000 Nombre total de pages (du PDF): 6
Page(s): 1995-2000
Nombre total de pages (du PDF): 6
DOI: 10.2749/newyork.2019.1995
Abstrait:

For improved safety and ease of travel for pedestrians and cyclists across the busy 4-lane main road Breidholtsbraut in the suburb of Breidholt in Reykjavik, Iceland, the Icelandic Road and Coastal Administration and Reykjavik City Council engaged EFLA Consulting Engineers and Studio Granda Architects for the design of a footbridge over the road. The bridge is an 86-m long, post-tensioned concrete girder in four spans and follows a curved alignment that plays on the landscaped surroundings. The attractive shape of the underside of the concrete girder is formed by a series of arcs; the cross-section having been used before by the design team to good effect. Aiming for minimized inspection and maintenance costs, the end abutments of the bridge are supported through a concealed concrete hinge, eliminating the need for bearings and construction joints. The stainless-steel wire mesh handrail was embedded into the concrete deck post casting, using a carefully planned core drilling procedure. The bridge does not have a support in the road central reserve, and this has allowed the bridge construction to proceed with only a few, short closures of the busy underlying road. The result is a well-received addition to the collection of Reykjavik footbridges.

Mots-clé:
béton précontraint par post-tension passerelle