0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Construction Project Scheduling Risk Analysis Using Event Chain Methodology: An Example of Airport Terminal Project

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Publié dans:
Page(s): 1330-1338
DOI: 10.4028/www.scientific.net/AMM.209-211.1330
Abstrait:

This paper describes a new perspective to consider and quantify uncertainty in construction schedules. In the study, a methodology was presented by modeling construction project scheduling using event chains, classification of the events and event chains, identification of critical events, analysis of effect of the events on project duration, and chance of project completion. To demonstrate the applicability and effectiveness of the proposed methodology, a real airport terminal example is provided. Moreover, schedule risk analysis system and risk break down structure are also developed as an essential part.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.4028/www.scientific.net/AMM.209-211.1330.
  • Informations
    sur cette fiche
  • Reference-ID
    10327233
  • Publié(e) le:
    24.07.2019
  • Modifié(e) le:
    24.07.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine