0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Construction Project Scheduling Risk Analysis Using Event Chain Methodology: An Example of Airport Terminal Project

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China)
Veröffentlicht in:
Seite(n): 1330-1338
DOI: 10.4028/www.scientific.net/AMM.209-211.1330
Abstrakt:

This paper describes a new perspective to consider and quantify uncertainty in construction schedules. In the study, a methodology was presented by modeling construction project scheduling using event chains, classification of the events and event chains, identification of critical events, analysis of effect of the events on project duration, and chance of project completion. To demonstrate the applicability and effectiveness of the proposed methodology, a real airport terminal example is provided. Moreover, schedule risk analysis system and risk break down structure are also developed as an essential part.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.4028/www.scientific.net/AMM.209-211.1330.
  • Über diese
    Datenseite
  • Reference-ID
    10327233
  • Veröffentlicht am:
    24.07.2019
  • Geändert am:
    24.07.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine