Construction of the Lewis and Clark cable-stayed bridge over the Ohio River

 Construction of the Lewis and Clark cable-stayed bridge over the Ohio River
Auteur(s):
Présenté pendant IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, publié dans , pp. 103-110
DOI: 10.2749/christchurch.2021.0103
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

Constructed under a $780 million public private partnership contract (P3), the Lewis and Clark Bridge crosses the Ohio River at approximately 13Km northeast of downtown Louisville, Kentucky, and fe...
Lire plus

Détails bibliographiques

Auteur(s): (Vice President, Chief Bridge Engineer Jacobs, Morristown, NJ, USA)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Publié dans:
Page(s): 103-110 Nombre total de pages (du PDF): 8
Page(s): 103-110
Nombre total de pages (du PDF): 8
DOI: 10.2749/christchurch.2021.0103
Abstrait:

Constructed under a $780 million public private partnership contract (P3), the Lewis and Clark Bridge crosses the Ohio River at approximately 13Km northeast of downtown Louisville, Kentucky, and features a 695.1 m long three-span symmetrical steel composite cable-stayed bridge with a center span of 365.9 m. To meet an aggressive schedule required by the Concessionaire towards earlier collection of toll revenues, the construction of the bridge was accelerated by nearly one year through early staging of the superstructure steel grillage in both the back spans while completing construction of the towers. The steel grillage for the Kentucky backspan was stick-built, while for the Indiana backspan it was incrementally launched into position in a unique such application in a cable-stayed bridge project in the US. Following the simultaneous completion of the two backspans and the towers, the center span construction proceeded in balanced cantilever constructing the two tower cantilevers simultaneously. 104 stay-cables were erected and the center span steel grillage and the 695m long cable-stayed deck (over 800 precast panels) constructed in record time of only five months. The paper provides an overview of bridge structural system and characteristic structural details, and discusses the methods of construction for the substructure, towers, and the superstructure of the cable-stayed bridge.