0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Chirajara Bridge Collapse

 Chirajara Bridge Collapse
Auteur(s): , ORCID, , ,
Présenté pendant IABSE Conference: Risk Intelligence of Infrastructures, Seoul, South Korea, 9-10 November 2020, publié dans , pp. 18-32
DOI: 10.2749/seoul.2020.018
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.17 MB

On January 15, 2018 at 11:49, the west pylon (B) of the cable-stayed Chirajara Bridge collapsed during construction of the bridge girder. The crossing is located approximately 20km NW of Villavicen...
Lire plus

Détails bibliographiques

Auteur(s): (Aarhus University, Aarhus, Denmark)
ORCID (Yokohama National University, Yokohama, Japan)
(Leonhardt Andrä und Partner, Stuttgart, Germany)
(Leonhardt Andrä und Partner, Stuttgart, Germany)
(Leonhardt Andrä und Partner, Stuttgart, Germany)
(KHO Consult, Copenhagen, Denmark)
(ES Consult, Copenhagen, Denmark)
(Rambøll, Esbjerg, Denmark)
(Rambøll, Esbjerg, Denmark)
(Smoltczyk und Partner, Stuttgart, Germany)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Conference: Risk Intelligence of Infrastructures, Seoul, South Korea, 9-10 November 2020
Publié dans:
Page(s): 18-32 Nombre total de pages (du PDF): 15
Page(s): 18-32
Nombre total de pages (du PDF): 15
DOI: 10.2749/seoul.2020.018
Abstrait:

On January 15, 2018 at 11:49, the west pylon (B) of the cable-stayed Chirajara Bridge collapsed during construction of the bridge girder. The crossing is located approximately 20km NW of Villavicencio, Colombia. The collapse led to the total destruction of Pylon B, together with the erected span of the bridge girder. Authorities reported nine fatalities resulting from the collapse. Shortly thereafter, the project insurer QBE Segures, Colombia commissioned an independent investigation into the collapse of the bridge, through loss adjusters ONC Adjusters, Bogotá, Colombia. An international team of engineering experts was assembled to undertake the investigation. The investigation was completed in August, 2018. Key findings and recommendations from the investigation are presented herewith.

Mots-clé:
Pont à haubans

Ouvrages et projets