The Chernobyl Shelter: a Mega-structure for a Safe Confinement

The Chernobyl Shelter: a Mega-structure for a Safe Confinement
Auteur(s):
Présenté pendant IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, publié dans , pp. K-37
DOI: 10.2749/nantes.2018.k-37
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.34 MB

The New Safe Confinement (NSC) project consists of a steel structure with a complex cladding system, on piled concrete foundations, destined to cover the “Object Shelter”, which was constructed ove...
Lire plus

Détails bibliographiques

Auteur(s): (Bouygues TP, Technical Division, France)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Publié dans:
Page(s): K-37 Nombre total de pages (du PDF): 18
Page(s): K-37
Nombre total de pages (du PDF): 18
DOI: 10.2749/nantes.2018.k-37
Abstrait:

The New Safe Confinement (NSC) project consists of a steel structure with a complex cladding system, on piled concrete foundations, destined to cover the “Object Shelter”, which was constructed over the Chernobyl Nuclear Power Plant reactor N°4. This reactor n°4 was destroyed in an accident in 1986.

The project was awarded in October 2007 to a Joint Venture “NOVARKA” (VINCI and BOUYGUES).

The NSC is an arch structure with a span of 257m, 162m long and 108m high. Its final skidded weight is 36 000 Tons. Foundations, permanently and temporary, involve some 800 piles of 1m diameter, driven or drilled to up to 25m, and near 120 000 m³ of reinforced concrete.

Two main cranes suspended at the ceiling of the arch will enable the dismantling operations of the “object Shelter”. A flexible sealing membrane is ensuring the air-tight connection between the arch and the existing buildings.