Challenges in Implementation of Urban Transport Projects in Mumbai
|
Détails bibliographiques
Auteur(s): |
P. R. K. Murthy
Vikas Naik |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Publié dans: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-6 | ||||
Nombre total de pages (du PDF): | 6 | ||||
Année: | 2013 | ||||
DOI: | 10.2749/222137813808626768 | ||||
Abstrait: |
Smooth and effective implementation of urban transportation infrastructure projects in the city of Mumbai requires in depth planning and meticulous execution. Key considerations amid constraints are shared in the presentation that covers elevated infrastructure projects of flyovers, mono and metro rail. |