Challenges in Implementation of Urban Transport Projects in Mumbai
|
Bibliografische Angaben
Autor(en): |
P. R. K. Murthy
Vikas Naik |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Veröffentlicht in: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Seite(n): | 1-6 | ||||
Anzahl der Seiten (im PDF): | 6 | ||||
Jahr: | 2013 | ||||
DOI: | 10.2749/222137813808626768 | ||||
Abstrakt: |
Smooth and effective implementation of urban transportation infrastructure projects in the city of Mumbai requires in depth planning and meticulous execution. Key considerations amid constraints are shared in the presentation that covers elevated infrastructure projects of flyovers, mono and metro rail. |
||||
Stichwörter: |
Ausführung Methodik
|