Bridge over the Cádiz bay, Spain

 Bridge over the Cádiz bay, Spain
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, publié dans , pp. 1947-1955
DOI: 10.2749/222137814814068535
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.14 MB

The bridge over the Cádiz Bay has a total length of 3157 m and crosses from Cádiz City to Puertorreal. The main bridge is a cable stayed solution with a main span of 540 m and approach spans of 20...
Lire plus

Détails bibliographiques

Auteur(s):








Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Publié dans:
Page(s): 1947-1955 Nombre total de pages (du PDF): 9
Page(s): 1947-1955
Nombre total de pages (du PDF): 9
Année: 2014
DOI: 10.2749/222137814814068535
Abstrait:

The bridge over the Cádiz Bay has a total length of 3157 m and crosses from Cádiz City to Puertorreal. The main bridge is a cable stayed solution with a main span of 540 m and approach spans of 200 m. and a maximum vertical clearance of 70 m. It will be one of the longest cable- stayed bridge in Europe.

The deck is a trapezoidal box girder 3.0 m deep in a composite construction steel concrete in the bridge over the bay and prestressed concrete in the bridge on the land side. The simply supported deck has a variable depth made of steel with an orthotropic deck. The total width varies from 33.20 to 34.20 m. The bridge will support 2 lanes carriageways for vehicles and 2 tracks carriageway for a tram. The pylon is a double Y shape reinforced concrete structure.

The bridge is currently under construction. The main span will be built by free cantilever system with 20 m long segments. The approach span on the Cadiz side will be built by incrementally launched segments. The approach spans on the Puertorreal side will be constructed span by span with a centering. The simply supported 150 m span will be lifted from a barge.

Mots-clé:
Pont à haubans pont en béton précontraint