Bridge over the Cádiz bay, Spain

 Bridge over the Cádiz bay, Spain
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, veröffentlicht in , S. 1947-1955
DOI: 10.2749/222137814814068535
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.14 MB

The bridge over the Cádiz Bay has a total length of 3157 m and crosses from Cádiz City to Puertorreal. The main bridge is a cable stayed solution with a main span of 540 m and approach spans of 20...
Weiterlesen

Bibliografische Angaben

Autor(en):








Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Veröffentlicht in:
Seite(n): 1947-1955 Anzahl der Seiten (im PDF): 9
Seite(n): 1947-1955
Anzahl der Seiten (im PDF): 9
Jahr: 2014
DOI: 10.2749/222137814814068535
Abstrakt:

The bridge over the Cádiz Bay has a total length of 3157 m and crosses from Cádiz City to Puertorreal. The main bridge is a cable stayed solution with a main span of 540 m and approach spans of 200 m. and a maximum vertical clearance of 70 m. It will be one of the longest cable- stayed bridge in Europe.

The deck is a trapezoidal box girder 3.0 m deep in a composite construction steel concrete in the bridge over the bay and prestressed concrete in the bridge on the land side. The simply supported deck has a variable depth made of steel with an orthotropic deck. The total width varies from 33.20 to 34.20 m. The bridge will support 2 lanes carriageways for vehicles and 2 tracks carriageway for a tram. The pylon is a double Y shape reinforced concrete structure.

The bridge is currently under construction. The main span will be built by free cantilever system with 20 m long segments. The approach span on the Cadiz side will be built by incrementally launched segments. The approach spans on the Puertorreal side will be constructed span by span with a centering. The simply supported 150 m span will be lifted from a barge.

Stichwörter:
Schrägseilbrücke Spannbetonbrücke