0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Benefits of parametric modelling in bridge design

 Benefits of parametric modelling in bridge design
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, publié dans , pp. 912-919
DOI: 10.2749/istanbul.2023.0912
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.53 MB

In the Netherlands, several large infrastructure projects are currently in the preparatory stages, all of which are closely linked in terms of timing. As a result, the design process for these proj...
Lire plus

Détails bibliographiques

Auteur(s): (Royal HaskoningDHV, Amersfoort, the Netherlands)
(Royal HaskoningDHV, Amersfoort, the Netherlands)
(HaskoningDHV, Amersfoort, the Netherlands)
(HaskoningDHV, Amersfoort, the Netherlands)
(HaskoningDHV, Amersfoort, the Netherlands)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Publié dans:
Page(s): 912-919 Nombre total de pages (du PDF): 8
Page(s): 912-919
Nombre total de pages (du PDF): 8
Année: 2023
DOI: 10.2749/istanbul.2023.0912
Abstrait:

In the Netherlands, several large infrastructure projects are currently in the preparatory stages, all of which are closely linked in terms of timing. As a result, the design process for these projects is limited by time. One such project, the A27, includes several large bridges. To optimize the design of these bridges, a parametric design model was developed. This model allows for the comparison of different bridge variants, to determine the most optimal design solution.

The parametric model was created Grasshopper (a plugin for the Rhinoceros 3D CAD application), which is used to create the coordination model, as well as the creation of the FEA and drawing models. This approach enabled the creation of drawings, calculations, initial automatic checks and visualization from a single scripted model. A workflow was established to ensure consistency and efficiency throughout the process. Additionally, a single source of truth and interoperability tools between different software packages were employed, to facilitate the inclusion of all stakeholders, such as clients, architects, and contractors, in the design process.

This paper aims to demonstrate the benefits of working parametrically by showcasing the application of the parametric model in the feasibility phase of the Keizersveer bridge in the tender. Specifically, the parametric model used for this project includes both an arch bridge and a cantilever bridge design.