Bert Hesselink
- Renovating the Van Brienenoord Bridge Steelwork in mechanical system of bascule bridge spanning 50m.. Dans: ce/papers, v. 6, n. 3-4 (septembre 2023). (2023):
- Bulb versus Trough. Dans: ce/papers, v. 6, n. 3-4 (septembre 2023). (2023):
- (2023): Benefits of parametric modelling in bridge design. Présenté pendant: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- (2021): BridgeDoctor, life cycle costs of bridges under control. Présenté pendant: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
- (2018): Recalculation of the Railway Bridge Buggenum. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018.
- (2018): Prolife: Strengthening a Steel Railway Bridge with Deck Sections. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018.
- (2013): Railway bridges / fly-over "Sporen in Den Bosch". Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2016): The design challenges of the new movable bascule bridge 'Parallelstructuur A12 Gouda'. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- (2016): Recalculation and strengthening of the double arch bridge. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- (2015): The assembly and replacement of the Weesperbridge. Présenté pendant: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
- (2007): Steel railway bridge deck design for noise emmission and maintenance cost reduction. Présenté pendant: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007.