Application of Logical Framework Approach on Sutong Bridge
|
Détails bibliographiques
Auteur(s): |
Jian Zhao
|
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 598-599 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0026 | ||||
Abstrait: |
This paper presents a literature review of the logical framework approach (LFA). A case study is conducted by application of LFA for the Sutong Bridge project, the longest cable-stayed bridge under construction at present in the world, to analyze the causes and effects for the insufficient quality management of bridge projects in China.It is identified that insufficient quality assurance system of contractor organization and poor site quality control are the immediate causes for the insufficient quality management of bridge construction in China. By creating problem trees and objective trees, alternative analysis for the different three options is performed. Further a project planning matrix is developed, based on which solutions are discussed and decisions are made by the owner, Sutong Bridge Construction Commanding Department. It is proved that by taking necessary measures the Sutong Bridge project has achieved its main goals of construction quality as expected. |
||||
Mots-clé: |
construction de ponts
|