0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The 1915 Çanakkale Bridge – Design and Construction of Substructure

The 1915 Çanakkale Bridge – Design and Construction of Substructure
Auteur(s): , , , ,
Présenté pendant IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, publié dans , pp. 575-582
DOI: 10.2749/istanbul.2023.0575
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.55 MB

The 1915 Çanakkale Bridge in Turkey carries the new Malkara-Çanakkale Motorway across the Dardanelles strait. This paper describes the design of the substructure of the suspension bridge, which has...
Lire plus

Détails bibliographiques

Auteur(s): (COWI A/S Lyngby, Denmark)
(COWI A/S Lyngby, Denmark)
(COWI A/S Lyngby, Denmark)
(COWI A/S Lyngby, Denmark)
(COWI A/S Lyngby, Denmark)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Publié dans:
Page(s): 575-582 Nombre total de pages (du PDF): 8
Page(s): 575-582
Nombre total de pages (du PDF): 8
Année: 2023
DOI: 10.2749/istanbul.2023.0575
Abstrait:

The 1915 Çanakkale Bridge in Turkey carries the new Malkara-Çanakkale Motorway across the Dardanelles strait. This paper describes the design of the substructure of the suspension bridge, which has a world record main span of 2023 m. The substructure consists of the two tower foundations, the two anchor blocks and the two side span piers.

The paper describes design to achieve fast-track construction and resilient structures with optimized material quantities. For the tower foundations an innovative solution consisting of a lower cellular reinforced concrete base and an upper part consisting of two hollow composite steel shafts which extends above water level have been developed. Critical temporary construction stages, including the immersion process, ship impact, and seismic loadings, call for complex structural analysis and verification.

For the anchor blocks efficient concepts have been developed to optimize quantities of concrete and excavation. At the European side this is done by taking advantage of the local soil conditions and activating the backfill on top of the anchor block as counterweight and at the Asian side anchor block an innovative concept with diaphragm panels at the bottom of the anchor block has been developed to enhance the horizontal shear resistance with the ground.

For the side span piers supporting the ends of the main steel bridge deck and the concrete girders of the approach bridges soft soil and seismic forces requires deep bored concrete pile foundations with special measures for improved soil in the upper liquefiable layers.

Mots-clé:
pont suspendu piles et culées

Ouvrages et projets