0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Design Example for Bridge Pier Scour Measures Using Toskanes

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1523
Page(s): 173-177
DOI: 10.1177/0361198196152300121
Abstrait:

Toskanes were developed as an alternative scour countermeasure where riprap is not feasible or available in large sizes. The Toskane design procedure is based on results of a hydraulic model study of several different piers and abutments. Toskanes can be fabricated in sizes to meet the design requirements. One example of installing Toskanes at a bridge with a pier and vertical abutments is presented. Criteria are provided to size the Toskane. Techniques for installation are suggested and costs for the project are estimated.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1177/0361198196152300121.
  • Informations
    sur cette fiche
  • Reference-ID
    10778585
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine