Yubin Zhang
- Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Dans: Engineering, Construction and Architectural Management. :
- Evaluation method of modification effect of direct-to-plant SBS modifier on asphalt. Dans: Construction and Building Materials, v. 419 (mars 2024). (2024):
- Design and Construction of Yunxi Bridge for Pedestrians and Non-Motorized Vehicles. Dans: Structural Engineering International. :
- Low-power vibrothermography detection technique for surface cracks on composite sucker rod. Dans: Smart Materials and Structures, v. 32, n. 3 (1 février 2023). (2023):
- Experimental study and theoretical modeling for the flexural property of multi-scale hybrid fiber reinforced SHCC. Dans: Case Studies in Construction Materials, v. 16 (juin 2022). (2022):
- Precast System and Assembly Connection of Cement Concrete Slabs for Road Pavement: A Review. Dans: Journal of Traffic and Transportation Engineering (English Edition), v. 9, n. 2 (avril 2022). (2022):
- BIM’s Formal and Informal Collaborative Networks in Traditional Procurement: Insights from the Construction Phase of a Hospital Case Study. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 6 (novembre 2021). (2021):
- (2020): The cause analysis of landslide disaster. Dans: IOP Conference Series: Materials Science and Engineering, v. 780 (avril 2020).
- Experience mining based on case-based reasoning for dispute settlement of international construction projects. Dans: Automation in Construction, v. 97 (janvier 2019). (2019):