BIM’s Formal and Informal Collaborative Networks in Traditional Procurement: Insights from the Construction Phase of a Hospital Case Study
Auteur(s): |
Qian Li
Heap-Yih Chong Cen-Ying Lee Yubin Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Management in Engineering (ASCE), novembre 2021, n. 6, v. 37 |
Page(s): | 05021008 |
DOI: | 10.1061/(asce)me.1943-5479.0000965 |
- Informations
sur cette fiche - Reference-ID
10626090 - Publié(e) le:
26.08.2021 - Modifié(e) le:
26.08.2021