Ping Yung
- Productivity losses in smoking breaks on construction sites: a case study. Dans: Engineering, Construction and Architectural Management, v. 19, n. 6 (novembre 2012). (2012):
- Statutory adjudication in Western Australia: adjudicators’ views. Dans: Engineering, Construction and Architectural Management, v. 22, n. 1 (janvier 2015). (2015):
- Implementation of corporate social responsibility in Australian construction SMEs. Dans: Engineering, Construction and Architectural Management, v. 22, n. 3 (mai 2015). (2015):
- Factors That Influence the Concession Period Length for Tunnel Projects under BOT Contracts. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 1 (janvier 2014). (2014):
- An innovative method for project control in LNG project through 5D CAD: A case study. Dans: Automation in Construction, v. 45 (septembre 2014). (2014):
- (2013): Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Dans: Advances in Civil Engineering, v. 2013 ( 2013).
- The Coase Theorem and a Coasian construction economics and management research agenda1. Dans: Construction Management and Economics, v. 26, n. 1 (janvier 2008). (2008):
- Institutional arrangements and construction safety in China: an empirical examination. Dans: Construction Management and Economics, v. 27, n. 5 (mai 2009). (2009):
- Supervising for quality: an empirical examination of institutional arrangements in China's construction industry. Dans: Construction Management and Economics, v. 26, n. 7 (juillet 2008). (2008):