0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Advances in Civil Engineering, , v. 2013
Page(s): 1-8
DOI: 10.1155/2013/189105
Abstrait:

Considering facilities management (FM) at the early design stage could potentially reduce the efforts for maintenance during the operational phase of facilities. Few efforts in construction industry have involved facility managers into the design phase. It was suggested that early adoption of facilities management will contribute to reducing the needs for major repairs and alternations that will otherwise occur at the operational phase. There should be an integrated data source providing information support for the building lifecycle. It is envisaged that Building Information Modelling (BIM) would fill the gap by acting as a visual model and a database throughout the building lifecycle. This paper develops a framework of how FM can be considered in design stage through BIM. Based on the framework, the paper explores how BIM will beneficially support FM in the design phase, such as space planning and energy analysis. A case study of using BIM to design facility managers' travelling path in the maintenance process is presented. The results show that early adoption of FM in design stage with BIM can significantly reduce life cycle costs.

Copyright: © 2013 Ying Wang et al.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée.

  • Informations
    sur cette fiche
  • Reference-ID
    10176952
  • Publié(e) le:
    07.12.2018
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine