- (2024): Data-Driven Decision Support for Equipment Selection and Maintenance Issues for Buildings. Dans: Buildings, v. 14, n. 2 (1 février 2024).
- Identification and analysis of communication barriers for construction projects with time uncertainties. Dans: Engineering, Construction and Architectural Management. :
- Graph-Based Automated Construction Scheduling without the Use of BIM. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023). (2023):
- Time-Series Data Mining of Minimum Design Height for River Bridge Deck Using Seasonal Trend Decomposition. Dans: Journal of Physics: Conference Series, v. 1284, n. 1 (1 août 2019). (2019):
- Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding. Dans: Journal of Construction Engineering and Management, v. 148, n. 4 (avril 2022). (2022):
- Comparing Natural Language Processing Methods to Cluster Construction Schedules. Dans: Journal of Construction Engineering and Management, v. 147, n. 10 (octobre 2021). (2021):
- Basic Physical Properties and Mechanical Behavior of Compacted Weathered Granite Soils. Dans: International Journal of Geomechanics, v. 17, n. 10 (octobre 2017). (2017):
- Studying Contract Provisions of Shared Responsibilities for Integrated Project Delivery under National and International Standard Forms. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017). (2017):
- Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Dans: Engineering, Construction and Architectural Management, v. 26, n. 7 (août 2019). (2019):
- Machine Learning of Concrete Temperature Development for Quality Control of Field Curing. Dans: Journal of Computing in Civil Engineering, v. 34, n. 5 (septembre 2020). (2020):
- Integrated Experiential Learning–Based Framework to Facilitate Project Planning in Civil Engineering and Construction Management Courses. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 145, n. 4 (octobre 2019). (2019):
- Location Optimization with Uncertainty for Industrial Project Using Discrete Block Model and Spatial Meshing Algorithm. Dans: Journal of Computing in Civil Engineering, v. 33, n. 2 (mars 2019). (2019):
- Big Data Analysis for Monitoring of Kick Formation in Complex Underwater Drilling Projects. Dans: Journal of Computing in Civil Engineering, v. 32, n. 5 (septembre 2018). (2018):
- Improved System for Modeling and Simulating Stadium Evacuation Plans. Dans: Journal of Computing in Civil Engineering, v. 31, n. 3 (mai 2017). (2017):
- Welded wire reinforcement versus random steel fibers in precast/prestressed ultra-high performance concrete I-girders. Dans: Construction and Building Materials, v. 24, n. 11 (novembre 2010). (2010):
- Simulation of Dynamic Energy Consumption in Modular Construction Manufacturing Processes. Dans: Journal of Architectural Engineering (ASCE), v. 24, n. 1 (mars 2018). (2018):