0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jiang, Fengchang / Xie, Haiyan / Inti, Sundeep / Issa, Raja R. A. / Vanka, Venkata Sai Vikas / Yu, Ye / Huang, Tianyi (2024): Data-Driven Decision Support for Equipment Selection and Maintenance Issues for Buildings. Dans: Buildings, v. 14, n. 2 (1 février 2024).

    https://doi.org/10.3390/buildings14020436

  2. Xie, Haiyan / Hong, Ying / Xin, Mengyang / Brilakis, Ioannis / Shi, Owen: Identification and analysis of communication barriers for construction projects with time uncertainties. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-07-2022-0669

  3. Hong, Ying / Xie, Haiyan / Agapaki, Eva / Brilakis, Ioannis (2023): Graph-Based Automated Construction Scheduling without the Use of BIM. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023).

    https://doi.org/10.1061/jcemd4.coeng-12687

  4. Xie, Haiyan / Hu, Xi (2019): Time-Series Data Mining of Minimum Design Height for River Bridge Deck Using Seasonal Trend Decomposition. Dans: Journal of Physics: Conference Series, v. 1284, n. 1 (1 août 2019).

    https://doi.org/10.1088/1742-6596/1284/1/012042

  5. Xie, Haiyan / Hong, Ying / Brilakis, Ioannis (2022): Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding. Dans: Journal of Construction Engineering and Management, v. 148, n. 4 (avril 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002241

  6. Hong, Ying / Xie, Haiyan / Bhumbra, Gary / Brilakis, Ioannis (2021): Comparing Natural Language Processing Methods to Cluster Construction Schedules. Dans: Journal of Construction Engineering and Management, v. 147, n. 10 (octobre 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002165

  7. Niu, Xirong / Xie, Haiyan / Sun, Yanfang / Yao, Yangping (2017): Basic Physical Properties and Mechanical Behavior of Compacted Weathered Granite Soils. Dans: International Journal of Geomechanics, v. 17, n. 10 (octobre 2017).

    https://doi.org/10.1061/(asce)gm.1943-5622.0000983

  8. Xie, Haiyan / Liu, Hua (2017): Studying Contract Provisions of Shared Responsibilities for Integrated Project Delivery under National and International Standard Forms. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000220

  9. Zhang, Jingxiao / Xie, Haiyan / Li, Hui (2019): Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Dans: Engineering, Construction and Architectural Management, v. 26, n. 7 (août 2019).

    https://doi.org/10.1108/ecam-08-2018-0321

  10. Xie, Haiyan / Shi, Wei / Issa, Raja R. A. / Guo, Xiaotong / Shi, Yao / Liu, Xiaojun (2020): Machine Learning of Concrete Temperature Development for Quality Control of Field Curing. Dans: Journal of Computing in Civil Engineering, v. 34, n. 5 (septembre 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000916

  11. Zhang, Jingxiao / Xie, Haiyan / Schmidt, Klaus / Xia, Bo / Li, Hui / Skitmore, Martin (2019): Integrated Experiential Learning–Based Framework to Facilitate Project Planning in Civil Engineering and Construction Management Courses. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 145, n. 4 (octobre 2019).

    https://doi.org/10.1061/(asce)ei.1943-5541.0000421

  12. Gu, Qinghua / Xie, Haiyan / Issa, Raja R. A. / Lu, Caiwu (2019): Location Optimization with Uncertainty for Industrial Project Using Discrete Block Model and Spatial Meshing Algorithm. Dans: Journal of Computing in Civil Engineering, v. 33, n. 2 (mars 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000809

  13. Xie, Haiyan / Shanmugam, Arun Kumar / Issa, Raja R. A. (2018): Big Data Analysis for Monitoring of Kick Formation in Complex Underwater Drilling Projects. Dans: Journal of Computing in Civil Engineering, v. 32, n. 5 (septembre 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000773

  14. Xie, Haiyan / Weerasekara, Nirmal N. / Issa, Raja R. A. (2017): Improved System for Modeling and Simulating Stadium Evacuation Plans. Dans: Journal of Computing in Civil Engineering, v. 31, n. 3 (mai 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000634

  15. Akhnoukh, Amin Kamal / Xie, Haiyan (2010): Welded wire reinforcement versus random steel fibers in precast/prestressed ultra-high performance concrete I-girders. Dans: Construction and Building Materials, v. 24, n. 11 (novembre 2010).

    https://doi.org/10.1016/j.conbuildmat.2010.04.037

  16. Xie, Haiyan / Chowdhury, Md Mukul / Issa, Raja R. A. / Shi, Wei (2018): Simulation of Dynamic Energy Consumption in Modular Construction Manufacturing Processes. Dans: Journal of Architectural Engineering (ASCE), v. 24, n. 1 (mars 2018).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000289

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine