Leopold Winkler
- Prerequisites for BIM‐based invoicing in NATM projects. Dans: Geomechanics and Tunnelling, v. 15, n. 3 (juin 2022). (2022):
- Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase. Dans: Geomechanics and Tunnelling, v. 15, n. 3 (juin 2022). (2022):