Leopold Winkler
- Prerequisites for BIM‐based invoicing in NATM projects. In: Geomechanics and Tunnelling, v. 15, n. 3 (Juni 2022). (2022):
- Adaptive and parameterised 3D BIM model for the tunnel tender and excavation phase. In: Geomechanics and Tunnelling, v. 15, n. 3 (Juni 2022). (2022):