Chang-Jung Wang
- Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow. Dans: Journal of Construction Engineering and Management, v. 136, n. 12 (décembre 2010). (2010):
- Optimization model for resource assignment problems of linear construction projects. Dans: Automation in Construction, v. 16, n. 4 (juillet 2007). (2007):
- Optimizing project selection and scheduling problems with time-dependent resource constraints. Dans: Automation in Construction, v. 20, n. 8 (décembre 2011). (2011):
- Optimizing linear project scheduling with multi-skilled crews. Dans: Automation in Construction, v. 24 (juillet 2012). (2012):
- Resource-constrained construction project scheduling model for profit maximization considering cash flow. Dans: Automation in Construction, v. 17, n. 8 (novembre 2008). (2008):