Chang-Jung Wang
- Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow. In: Journal of Construction Engineering and Management, v. 136, n. 12 (Dezember 2010). (2010):
- Optimization model for resource assignment problems of linear construction projects. In: Automation in Construction, v. 16, n. 4 (Juli 2007). (2007):
- Optimizing project selection and scheduling problems with time-dependent resource constraints. In: Automation in Construction, v. 20, n. 8 (Dezember 2011). (2011):
- Optimizing linear project scheduling with multi-skilled crews. In: Automation in Construction, v. 24 (Juli 2012). (2012):
- Resource-constrained construction project scheduling model for profit maximization considering cash flow. In: Automation in Construction, v. 17, n. 8 (November 2008). (2008):