Christian Stoy
- Implementing asset information requirement templates for corporate real estate management: A study in the chemical industry. Dans: Developments in the Built Environment, v. 16 (décembre 2023). (2023):
- (2022): BIM for CREM: Exploring the Benefit of Building Information Modelling for Facility Management in Corporate Real Estate Management. Dans: Buildings, v. 12, n. 4 (11 avril 2022).
- Construction duration of residential building projects in Germany. Dans: Engineering, Construction and Architectural Management, v. 14, n. 1 (janvier 2007). (2007):
- Determinants of construction duration for building projects in Germany. Dans: Engineering, Construction and Architectural Management, v. 19, n. 4 (juin 2012). (2012):
- Estimation model and benchmarks for heating energy consumption of schools and sport facilities in Germany. Dans: Building and Environment, v. 49 (mars 2012). (2012):
- Drivers for Cost Estimating in Early Design: Case Study of Residential Construction. Dans: Journal of Construction Engineering and Management, v. 134, n. 1 (janvier 2008). (2008):
- Residential Building Projects: Building Cost Indicators and Drivers. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007). (2007):
- The determination of occupancy costs during early project phases. Dans: Construction Management and Economics, v. 24, n. 9 (septembre 2006). (2006):
- Benchmarking electricity consumption. Dans: Construction Management and Economics, v. 24, n. 10 (octobre 2006). (2006):
- Time–cost relationship of building projects: statistical adequacy of categorization with respect to project location. Dans: Construction Management and Economics, v. 29, n. 1 (janvier 2011). (2011):
- Estimation models for heating energy and electricity costs. Dans: Construction Management and Economics, v. 34, n. 9 (juillet 2015). (2015):
- Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016). (2016):
- Kostenermittlung in frühen Projektphasen. Ein Verfahren auf der Grundlage von Planungs- und Kostenkennwerten. Dans: Bautechnik, v. 78, n. 12 (décembre 2001). (2001):