Construction duration of residential building projects in Germany
Auteur(s): |
Christian Stoy
Frank Dreier Hans‐Rudolf Schalcher |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, janvier 2007, n. 1, v. 14 |
Page(s): | 52-64 |
DOI: | 10.1108/09699980710716972 |
Abstrait: |
PurposePlanning the construction duration is an important consideration in any construction project. Indicators that permit an early forecast of the duration provide the basis for such planning. To date, such a basis has been lacking in the German‐speaking area. This paper aims to discuss this matter. Design/methodology/approachIndicators are identified that enable a forecast of the construction duration. In addition, a simple regression model is provided to assist in selecting construction speed indicators. This empirical analysis relies on the data, collected on a uniform basis, from 115 German residential buildings. FindingsProject size (measured in m² gross external floor area) and project standard (measured in € building construction cost/m² gross external floor area) are found to be significant drivers of construction speed. It appears that project size, in contrast to the project standard, is positively correlated with construction speed. Originality/valueAn expansion of the data pool is required for more extensive study. On the one hand, this means including relevant drivers that have only been insufficiently considered to date, such as project complexity, project environment, management‐related attributes. On the other hand, the data pool must also be expanded to include other types of use. |
- Informations
sur cette fiche - Reference-ID
10576111 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021