- (2023): A Memetic Algorithm for the Solution of the Resource Leveling Problem. Dans: Buildings, v. 13, n. 11 (26 octobre 2023).
- Decentralized tendering of construction projects using blockchain-based smart contracts and storage systems. Dans: Automation in Construction, v. 151 (juillet 2023). (2023):
- (2023): Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation. Dans: Buildings, v. 13, n. 3 (26 février 2023).
- BIM integrated smart contract for construction project progress payment administration. Dans: Automation in Construction, v. 139 (juillet 2022). (2022):
- A smart contract system for security of payment of construction contracts. Dans: Automation in Construction, v. 120 (décembre 2020). (2020):
- Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem. Dans: Journal of Construction Engineering and Management, v. 146, n. 8 (août 2020). (2020):
- Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016). (2016):
- Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015). (2015):
- Quantiative Methodology for Determination of Cost Contingency in International Projects. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 1 (janvier 2007). (2007):
- A support vector machine method for bid/no bid decision making. Dans: Journal of Civil Engineering and Management, v. 23, n. 5 (mai 2017). (2017):
- Predesign Cost Estimation of Urban Railway Projects With Parametric Modeling. Dans: Journal of Civil Engineering and Management, v. 15, n. 4 (décembre 2009). (2009):
- Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem. Dans: Journal of Computing in Civil Engineering, v. 31, n. 1 (janvier 2017). (2017):
- Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem. Dans: Journal of Computing in Civil Engineering, v. 29, n. 5 (septembre 2015). (2015):
- Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap. Dans: Journal of Construction Engineering and Management, v. 134, n. 12 (décembre 2008). (2008):
- Construction Labor Productivity Modeling with Neural Networks. Dans: Journal of Construction Engineering and Management, v. 124, n. 6 (décembre 1998). (1998):
- Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016). (2016):
- Conceptual cost estimation of building projects with regression analysis and neural networks. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 4 (août 2004). (2004):
- Geographic information system–based visualization system for planning and monitoring of repetitive construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (novembre 2008). (2008):
- Impact of occasional overtime on construction labor productivity: quantitative analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 7 (juillet 2007). (2007):