0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Iranagh, Mehdi / Sonmez, Rifat / Atan, Tankut / Uysal, Furkan / Bettemir, Önder Halis (2023): A Memetic Algorithm for the Solution of the Resource Leveling Problem. Dans: Buildings, v. 13, n. 11 (26 octobre 2023).

    https://doi.org/10.3390/buildings13112738

  2. Ahmadisheykhsarmast, Salar / Senji, Sina Golmohammadi / Sonmez, Rifat (2023): Decentralized tendering of construction projects using blockchain-based smart contracts and storage systems. Dans: Automation in Construction, v. 151 (juillet 2023).

    https://doi.org/10.1016/j.autcon.2023.104900

  3. Uysal, Furkan / Sonmez, Rifat (2023): Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation. Dans: Buildings, v. 13, n. 3 (26 février 2023).

    https://doi.org/10.3390/buildings13030651

  4. Sonmez, Rifat / Ahmadisheykhsarmast, Salar / Güngör, Aslı Akçamete (2022): BIM integrated smart contract for construction project progress payment administration. Dans: Automation in Construction, v. 139 (juillet 2022).

    https://doi.org/10.1016/j.autcon.2022.104294

  5. Ahmadisheykhsarmast, Salar / Sonmez, Rifat (2020): A smart contract system for security of payment of construction contracts. Dans: Automation in Construction, v. 120 (décembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103401

  6. Sonmez, Rifat / Aminbakhsh, Saman / Atan, Tankut (2020): Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem. Dans: Journal of Construction Engineering and Management, v. 146, n. 8 (août 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001870

  7. Sonmez, Rifat / Gürel, Mustafa (2016): Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000468

  8. Bettemir, Önder Halis / Sonmez, Rifat (2015): Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000323

  9. Sonmez, Rifat / Ergin, Arif / Birgonul, M. Talat (2007): Quantiative Methodology for Determination of Cost Contingency in International Projects. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 1 (janvier 2007).

    https://doi.org/10.1061/(asce)0742-597x(2007)23:1(35)

  10. Sonmez, Rifat / Sözgen, Burak (2017): A support vector machine method for bid/no bid decision making. Dans: Journal of Civil Engineering and Management, v. 23, n. 5 (mai 2017).

    https://doi.org/10.3846/13923730.2017.1281836

  11. Sonmez, Rifat / Ontepeli, Bahadir (2009): Predesign Cost Estimation of Urban Railway Projects With Parametric Modeling. Dans: Journal of Civil Engineering and Management, v. 15, n. 4 (décembre 2009).

    https://doi.org/10.3846/1392-3730.2009.15.405-409

  12. Aminbakhsh, Saman / Sonmez, Rifat (2017): Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem. Dans: Journal of Computing in Civil Engineering, v. 31, n. 1 (janvier 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000606

  13. Sonmez, Rifat / Uysal, Furkan (2015): Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem. Dans: Journal of Computing in Civil Engineering, v. 29, n. 5 (septembre 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000382

  14. Sonmez, Rifat (2008): Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap. Dans: Journal of Construction Engineering and Management, v. 134, n. 12 (décembre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:12(1011)

  15. Sonmez, Rifat / Rowings, James E. (1998): Construction Labor Productivity Modeling with Neural Networks. Dans: Journal of Construction Engineering and Management, v. 124, n. 6 (décembre 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:6(498)

  16. Sonmez, Rifat / Iranagh, Mahdi Abbasi / Uysal, Furkan (2016): Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001077

  17. Sonmez, Rifat (2004): Conceptual cost estimation of building projects with regression analysis and neural networks. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 4 (août 2004).

    https://doi.org/10.1139/l04-029

  18. Sonmez, Rifat / Uysal, Furkan (2008): Geographic information system–based visualization system for planning and monitoring of repetitive construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (novembre 2008).

    https://doi.org/10.1139/l08-083

  19. Sonmez, Rifat (2007): Impact of occasional overtime on construction labor productivity: quantitative analysis. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 7 (juillet 2007).

    https://doi.org/10.1139/l07-004

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine