- (2023): A Memetic Algorithm for the Solution of the Resource Leveling Problem. In: Buildings, v. 13, n. 11 (26 Oktober 2023).
- Decentralized tendering of construction projects using blockchain-based smart contracts and storage systems. In: Automation in Construction, v. 151 (Juli 2023). (2023):
- (2023): Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation. In: Buildings, v. 13, n. 3 (26 Februar 2023).
- BIM integrated smart contract for construction project progress payment administration. In: Automation in Construction, v. 139 (Juli 2022). (2022):
- A smart contract system for security of payment of construction contracts. In: Automation in Construction, v. 120 (Dezember 2020). (2020):
- Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem. In: Journal of Construction Engineering and Management, v. 146, n. 8 (August 2020). (2020):
- Hybrid Optimization Method for Large-Scale Multimode Resource-Constrained Project Scheduling Problem. In: Journal of Management in Engineering (ASCE), v. 32, n. 6 (November 2016). (2016):
- Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015). (2015):
- Quantiative Methodology for Determination of Cost Contingency in International Projects. In: Journal of Management in Engineering (ASCE), v. 23, n. 1 (Januar 2007). (2007):
- A support vector machine method for bid/no bid decision making. In: Journal of Civil Engineering and Management, v. 23, n. 5 (Mai 2017). (2017):
- Predesign Cost Estimation of Urban Railway Projects With Parametric Modeling. In: Journal of Civil Engineering and Management, v. 15, n. 4 (Dezember 2009). (2009):
- Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem. In: Journal of Computing in Civil Engineering, v. 31, n. 1 (Januar 2017). (2017):
- Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015). (2015):
- Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap. In: Journal of Construction Engineering and Management, v. 134, n. 12 (Dezember 2008). (2008):
- Construction Labor Productivity Modeling with Neural Networks. In: Journal of Construction Engineering and Management, v. 124, n. 6 (Dezember 1998). (1998):
- Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. In: Journal of Construction Engineering and Management, v. 142, n. 3 (März 2016). (2016):
- Conceptual cost estimation of building projects with regression analysis and neural networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 31, n. 4 (August 2004). (2004):
- Geographic information system–based visualization system for planning and monitoring of repetitive construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (November 2008). (2008):
- Impact of occasional overtime on construction labor productivity: quantitative analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 7 (Juli 2007). (2007):