- A robust prediction model for displacement of concrete dams subjected to irregular water‐level fluctuations. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 5 (mai 2021). (2021):
- Three-Dimensional Simulation on the Water Flow Field and Suspended Solids Concentration in the Rectangular Sedimentation Tank. Dans: Journal of Environmental Engineering (ASCE), v. 134, n. 11 (novembre 2008). (2008):
- Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Dans: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021). (2021):
- Productivity analysis of trailing suction hopper dredgers using stacking strategy. Dans: Automation in Construction, v. 122 (février 2021). (2021):
- Developing a Common Library of Prefabricated Structure Components through Graphic Media Mapping to Improve Design Efficiency. Dans: Journal of Construction Engineering and Management, v. 147, n. 1 (janvier 2021). (2021):
- Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance. Dans: Journal of Management in Engineering (ASCE), v. 25, n. 1 (janvier 2009). (2009):
- Expenditure on Snow and Ice Control for Roadway Maintenance. Dans: Journal of Cold Regions Engineering, v. 31, n. 4 (décembre 2017). (2017):
- Virtual Shop Model for Experimental Planning of Steel Fabrication Projects. Dans: Journal of Computing in Civil Engineering, v. 20, n. 5 (septembre 2006). (2006):
- Milled pavement texturing to optimize skid improvements. Dans: Construction and Building Materials, v. 101 (décembre 2015). (2015):
- Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004). (2004):
- Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. Dans: Automation in Construction, v. 27 (novembre 2012). (2012):
- Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012). (2012):
- Quantifying Engineering Project Scope for Productivity Modeling. Dans: Journal of Construction Engineering and Management, v. 131, n. 3 (mars 2005). (2005):
- Measuring and Modeling Labor Productivity Using Historical Data. Dans: Journal of Construction Engineering and Management, v. 134, n. 10 (octobre 2008). (2008):
- Lean construction implementation and its implication on sustainability: a contractor's case study. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 3 (mars 2011). (2011):
- Modeling uncertainty with an integrated simulation system. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (juin 2005). (2005):
- Simplified Method for Evaluating the Impact of a Transportation Network on Posthurricane Access to Healthcare Facilities. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 1 (février 2016). (2016):