Lingguang Song
- A robust prediction model for displacement of concrete dams subjected to irregular water‐level fluctuations. In: Computer-Aided Civil and Infrastructure Engineering, v. 36, n. 5 (Mai 2021). (2021):
- Three-Dimensional Simulation on the Water Flow Field and Suspended Solids Concentration in the Rectangular Sedimentation Tank. In: Journal of Environmental Engineering (ASCE), v. 134, n. 11 (November 2008). (2008):
- Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. In: Engineering, Construction and Architectural Management, v. 28, n. 7 ( 2021). (2021):
- Productivity analysis of trailing suction hopper dredgers using stacking strategy. In: Automation in Construction, v. 122 (Februar 2021). (2021):
- Developing a Common Library of Prefabricated Structure Components through Graphic Media Mapping to Improve Design Efficiency. In: Journal of Construction Engineering and Management, v. 147, n. 1 (Januar 2021). (2021):
- Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance. In: Journal of Management in Engineering (ASCE), v. 25, n. 1 (Januar 2009). (2009):
- Expenditure on Snow and Ice Control for Roadway Maintenance. In: Journal of Cold Regions Engineering, v. 31, n. 4 (Dezember 2017). (2017):
- Virtual Shop Model for Experimental Planning of Steel Fabrication Projects. In: Journal of Computing in Civil Engineering, v. 20, n. 5 (September 2006). (2006):
- Milled pavement texturing to optimize skid improvements. In: Construction and Building Materials, v. 101 (Dezember 2015). (2015):
- Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. In: Journal of Construction Engineering and Management, v. 130, n. 5 (Oktober 2004). (2004):
- Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. In: Automation in Construction, v. 27 (November 2012). (2012):
- Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data. In: Journal of Construction Engineering and Management, v. 138, n. 9 (September 2012). (2012):
- Quantifying Engineering Project Scope for Productivity Modeling. In: Journal of Construction Engineering and Management, v. 131, n. 3 (März 2005). (2005):
- Measuring and Modeling Labor Productivity Using Historical Data. In: Journal of Construction Engineering and Management, v. 134, n. 10 (Oktober 2008). (2008):
- Lean construction implementation and its implication on sustainability: a contractor's case study. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 3 (März 2011). (2011):
- Modeling uncertainty with an integrated simulation system. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (Juni 2005). (2005):
- Simplified Method for Evaluating the Impact of a Transportation Network on Posthurricane Access to Healthcare Facilities. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 1 (Februar 2016). (2016):