Tobias Schachinger
- A Robotic Tunnel Drainage Inspection Rover. Dans: Transportation Research Procedia, v. 72 ( 2023). (2023):
- MDB – Leistungsfähiges, flexibles und betriebsorientiertes Drainagespülen in Eisenbahntunneln. Dans: Geomechanics and Tunnelling, v. 15, n. 4 (août 2022). (2022):
- Research on pipe materials for tunnel drainage by the ÖBB Task Force Drainage. Dans: Geomechanics and Tunnelling, v. 12, n. 5 (octobre 2019). (2019):
- Fibre-optic supported measurement methods for monitoring rock pressure. Dans: Geomechanics and Tunnelling, v. 11, n. 3 (juin 2018). (2018):
- Current research by ÖBB Infrastruktur AG on scale monitoring without track closures. Dans: Geomechanics and Tunnelling, v. 11, n. 3 (juin 2018). (2018):
- Gloggnitz contract after completion of the intermediate access at Göstritz. Dans: Geomechanics and Tunnelling, v. 10, n. 6 (novembre 2017). (2017):
- Task Force Drainage (TFD) - The project for life after. Dans: Geomechanics and Tunnelling, v. 10, n. 6 (novembre 2017). (2017):
- Semmering Base Tunnel - Excavation of the emergency station in complex ground conditions. Dans: Geomechanics and Tunnelling, v. 10, n. 5 (octobre 2017). (2017):
- Semmering Base Tunnel - Design and construction of the shaft head caverns under difficult conditions. Dans: Geomechanics and Tunnelling, v. 11, n. 5 (octobre 2018). (2018):
- Prediction of fault zones based on geological and geotechnical observations during tunnel construction. Dans: Geomechanics and Tunnelling, v. 10, n. 4 (août 2017). (2017):
- The challenges of contract SBT1.1 "Tunnel Gloggnitz" / Die Herausforderungen des Bauloses SBT1.1 Tunnel Gloggnitz. Dans: Geomechanics and Tunnelling, v. 8, n. 6 ( 2015). (2015):
- Preliminary works for the new Semmering Base Tunnel - geotechnical monitoring of slope stabilization measures and earth retaining structures / Vorarbeiten für den Semmering-Basistunnel neu - geotechnisches Monitoring bei Hangsicherungen und Stützkonstruktionen. Dans: Geomechanics and Tunnelling, v. 7, n. 4 ( 2014). (2014):
- The preparatory works for the new Semmering Base Tunnel / Die Vorarbeiten für den Semmering-Basistunnel neu. Dans: Geomechanics and Tunnelling, v. 6, n. 6 ( 2013). (2013):