Mohammad Rezazadeh
- Integrated BIM-based simulation for automated time-space conflict management in construction projects. Dans: Automation in Construction, v. 132 (décembre 2021). (2021):
- Charged System Search and Magnetic Charged System Search Algorithms for Construction Site Layout Planning Optimization. Dans: Periodica Polytechnica Civil Engineering. :