Mohammad Rezazadeh
- Integrated BIM-based simulation for automated time-space conflict management in construction projects. In: Automation in Construction, v. 132 (Dezember 2021). (2021):
- Charged System Search and Magnetic Charged System Search Algorithms for Construction Site Layout Planning Optimization. In: Periodica Polytechnica Civil Engineering. :