A. D. F. Price
- The strategy process within large construction orgnisations. Dans: Engineering, Construction and Architectural Management, v. 10, n. 4 (août 2003). (2003):
- A review of construction operative motivation. Dans: Building and Environment, v. 24, n. 3 (janvier 1989). (1989):
- Problems influencing craftsmen's productivity in Nigeria. Dans: Building and Environment, v. 22, n. 4 (janvier 1987). (1987):
- Strategic Management: Consideration of Paradoxes, Processes, and Associated Concepts as Applied to Construction. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 4 (octobre 2003). (2003):
- Structural frame selection: case studies of hybrid concrete frames. Dans: Building Research & Information, v. 35, n. 2 ( 2007). (2007):
- Survey of Project Related Finance in United Arab Emirates. Dans: Journal of Construction Engineering and Management, v. 123, n. 3 (septembre 1997). (1997):
- SHERPA: Mobile Wireless Data Capture for Piling Works. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 18, n. 4 (juillet 2003). (2003):
- A strategic framework for change management. Dans: Construction Management and Economics, v. 24, n. 3 (mars 2006). (2006):
- Towards an explicit design decision process: the case of the structural frame. Dans: Construction Management and Economics, v. 24, n. 6 (juin 2006). (2006):
- Using BIM to integrate and achieve holistic future-proofing objectives in healthcare projects. Dans: Construction Management and Economics, v. 33, n. 11-12 (décembre 2014). (2014):
- Relationship between value and duration of construction projects. Dans: Construction Management and Economics, v. 9, n. 4 (juillet 1991). (1991):