Herrera, Rodrigo F. / Mourgues, Claudio / Alarcon, Luis F. / Pellicer, Eugenio (2020): Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis. Dans: Journal of Construction Engineering and Management, v. 146, n. 6 (juin 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001841
-
Ponz-Tienda, J. L. / Salcedo-Bernal, A. / Pellicer, Eugenio (2017): A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 6 (mai 2017).
https://doi.org/10.1111/mice.12233
-
Palomar, Isabel Jordán / García Valldecabres, Jorge L. / Tzortzopoulos, Patricia / Pellicer, Eugenio (2020): An online platform to unify and synchronise heritage architecture information. Dans: Automation in Construction, v. 110 (février 2020).
https://doi.org/10.1016/j.autcon.2019.103008
-
Montalbán-Domingo, Laura / García-Segura, Tatiana / Amalia Sanz, M. / Pellicer, Eugenio (2019): Social Sustainability in Delivery and Procurement of Public Construction Contracts. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 2 (mars 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000674
-
Yepes, Víctor / Torres-Machi, Cristina / Chamorro, Alondra / Pellicer, Eugenio (2016): Optimal Pavement Maintenance Programs Based on A Hybrid Greedy Randomized Adaptive Search Procedure Algorithm. Dans: Journal of Civil Engineering and Management, v. 22, n. 4 (août 2016).
https://doi.org/10.3846/13923730.2015.1120770
-
Alshubbak, Ali / Pellicer, Eugenio / Catalá, Joaquín / Teixeira, José M. C. (2015): A Model for Identifying Owner’s Needs in the Building Life Cycle. Dans: Journal of Civil Engineering and Management, v. 21, n. 8 (novembre 2015).
https://doi.org/10.3846/13923730.2015.1027257
-
Pellicer, Eugenio / Yepes, Víctor / Ortega, Alejandro J. / Carrión, Andrés (2017): Market Demands on Construction Management: View from Graduate Students. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 143, n. 4 (octobre 2017).
https://doi.org/10.1061/(asce)ei.1943-5541.0000334
-
Pellicer, Eugenio / Yepes, Víctor / Ortega, Alejandro J. (2013): Method for Planning Graduate Programs in Construction Management. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 139, n. 1 (janvier 2013).
https://doi.org/10.1061/(asce)ei.1943-5541.0000120
-
Pellicer, Eugenio / Carvajal, Gloria I. / Rubio, M. Carmen / Catalá, Joaquín (2014): A method to estimate occupational health and safety costs in construction projects. Dans: KSCE Journal of Civil Engineering, v. 18, n. 7 (juillet 2014).
https://doi.org/10.1007/s12205-014-0591-2
-
Ponz-Tienda, Jose Luis / Yepes, Víctor / Pellicer, Eugenio / Moreno-Flores, Joaquin (2013): The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm. Dans: Automation in Construction, v. 29 (janvier 2013).
https://doi.org/10.1016/j.autcon.2012.10.003
-
Ballesteros-Pérez, Pablo / Rojas-Céspedes, Yonatan Alexis / Hughes, Will / Kabiri, Shabnam / Pellicer, Eugenio / Mora-Melià, Daniel / del Campo-Hitschfeld, Maria Luisa (2017): Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims. Dans: Automation in Construction, v. 84 (décembre 2017).
https://doi.org/10.1016/j.autcon.2017.08.022
-
Sierra, Leonardo A. / Pellicer, Eugenio / Yepes, Víctor (2016): Social Sustainability in the Lifecycle of Chilean Public Infrastructure. Dans: Journal of Construction Engineering and Management, v. 142, n. 5 (mai 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001099
-
Ballesteros-Pérez, Pablo / Skitmore, Martin / Pellicer, Eugenio / González-Cruz, M. Carmen (2014): Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review. Dans: Construction Management and Economics, v. 33, n. 4 (juillet 2014).
https://doi.org/10.1080/01446193.2015.1059951
-
Pellicer, Eugenio / Yepes, Víctor / Correa, Christian L. / Alarcon, Luis F. (2014): Modelo para la Innovación Sistemática en Empresas Constructoras. Dans: Journal of Construction Engineering and Management, v. 140, n. 4 (avril 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000468
-
Pellicer, Eugenio / Yepes, Víctor / Correa, Christian L. / Alarcon, Luis F. (2014): Model for Systematic Innovation in Construction Companies. Dans: Journal of Construction Engineering and Management, v. 140, n. 4 (avril 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000700
-
Oviedo-Haito, Ricardo J. / Jiménez, Jaime / Cardoso, Francisco F. / Pellicer, Eugenio (2014): Survival Factors for Subcontractors in Economic Downturns. Dans: Journal of Construction Engineering and Management, v. 140, n. 3 (mars 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000811
-
Ballesteros-Pérez, Pablo / Skitmore, Martin / Pellicer, Eugenio / Zhang, Xiaoling (2016): Scoring Rules and Competitive Behavior in Best-Value Construction Auctions. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001144
-
Clemente, Alejandro / José Vea, Francisco / Pellicer, Eugenio / Yepes, Víctor (2008): Optimización del proceso de cimbrado consecutivo de forjados. Présenté pendant: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008.