A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
Auteur(s): |
J. L. Ponz-Tienda
A. Salcedo-Bernal Eugenio Pellicer |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Computer-Aided Civil and Infrastructure Engineering, mai 2017, n. 6, v. 32 |
Page(s): | 474-498 |
DOI: | 10.1111/mice.12233 |
- Informations
sur cette fiche - Reference-ID
10415479 - Publié(e) le:
05.03.2020 - Modifié(e) le:
05.03.2020