Hylton Olivieri
- Solving design management problems using lean design management: the role of trust. Dans: Engineering, Construction and Architectural Management, v. 26, n. 7 (août 2019). (2019):
- A utilização de novos sistemas construtivos para a redução no uso de insumos nos canteiros de obras: Light Steel Framing. Dans: Ambiente Construído, v. 17, n. 4 (décembre 2017). (2017):
- Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado. Dans: Ambiente Construído, v. 16, n. 1 (janvier 2016). (2016):
- Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques. Dans: Journal of Construction Engineering and Management, v. 145, n. 12 (décembre 2019). (2019):
- (2019): Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management. Dans: Buildings, v. 9, n. 5 (avril 2019).
- Real-time resource tracking for analyzing value-adding time in construction. Dans: Automation in Construction, v. 104 (août 2019). (2019):
- Categorizing modularization strategies to achieve various objectives of building investments. Dans: Construction Management and Economics, v. 36, n. 1 (août 2017). (2017):
- Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Dans: Construction Management and Economics, v. 36, n. 2 (mai 2017). (2017):