Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
Auteur(s): |
Hylton Olivieri
Olli Seppänen Ariovaldo Denis Granja |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, mai 2017, n. 2, v. 36 |
Page(s): | 109-124 |
DOI: | 10.1080/01446193.2017.1410561 |
- Informations
sur cette fiche - Reference-ID
10216519 - Publié(e) le:
04.12.2018 - Modifié(e) le:
04.12.2018