-
Rahnamayiezekavat, Payam / Wang, Di / Chai, Jian / Moon, Sungkon / Rashidi, Maria / Wang, Xiangyu: Automated pavement marking integrity assessment using a UAV platform – a test case of public parking. Dans: Journal of Asian Architecture and Building Engineering.
https://doi.org/10.1080/13467581.2024.2329358
-
Kim, Jangsoon / Shin, Wonwoo / Han, SangHyeok / Moon, Sungkon / Kim, Jae-Jun (2024): Enhancing occupant experience in defect repair services through text mining-based latent dirichlet allocation metric identification. Dans: Developments in the Built Environment, v. 17 (mars 2024).
https://doi.org/10.1016/j.dibe.2024.100354
-
Noh, Seok-Ho / Jo, Inho / Han, SangHyeok / Moon, Sungkon / Kim, Jae-Jun (2023): Identification of Occupant Dissatisfaction Factors in Newly Constructed Apartments: Text Mining and Semantic Network Analysis. Dans: Buildings, v. 13, n. 12 (22 novembre 2023).
https://doi.org/10.3390/buildings13122933
-
Chen, Haosen / Hou, Lei / Wu, Shaoze / Zhang, Guomin / Zou, Yang / Moon, Sungkon / Bhuiyan, Muhammed (2024): Augmented reality, deep learning and vision-language query system for construction worker safety. Dans: Automation in Construction, v. 157 (janvier 2024).
https://doi.org/10.1016/j.autcon.2023.105158
-
Page, Dominic / Hou, Lei / Rahnamayiezekavat, Payam / Antwi-Afari, Maxwell Fordjour / Han, SangHyeok / Moon, Sungkon (2023): Exploring Effect of Different Resource Qualities on Process Efficiency In Construction Pile Installation. Dans: Journal of Civil Engineering and Management, v. 29, n. 5 (5 avril 2023).
https://doi.org/10.3846/jcem.2023.19215
-
Zaalouk, Ahmed / Moon, Sungkon / Han, SangHyeok (2023): Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions. Dans: Automation in Construction, v. 153 (septembre 2023).
https://doi.org/10.1016/j.autcon.2023.104952
-
Rahnamayiezekavat, Payam / Sorooshnia, Ehsan / Rashidi, Maria / Faraji, Amir / Mostafa, Sherif / Moon, Sungkon (2022): Forensic Analysis of the Disputes Typology of the NSW Construction Industry Using PLS-SEM and Prospective Trend Analysis. Dans: Buildings, v. 12, n. 10 (20 septembre 2022).
https://doi.org/10.3390/buildings12101571
-
Hebiba, AlaaEldin Magdy / Bouferguene, Ahmed / Moon, Sungkon / Han, SangHyeok (2022): Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location. Dans: Journal of Construction Engineering and Management, v. 148, n. 11 (novembre 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002377
-
Na, Sangho / Kim, Sungjin / Moon, Sungkon (2022): Additive manufacturing (3D Printing)-applied construction: Smart node system for an irregular building façade. Dans: Journal of Building Engineering, v. 56 (septembre 2022).
https://doi.org/10.1016/j.jobe.2022.104743
-
Lee, Seungho / Kim, Seokhyeon / Moon, Sungkon (2022): Development of a Car-Free Street Mapping Model Using an Integrated System with Unmanned Aerial Vehicles, Aerial Mapping Cameras, and a Deep Learning Algorithm. Dans: Journal of Computing in Civil Engineering, v. 36, n. 3 (mai 2022).
https://doi.org/10.1061/(asce)cp.1943-5487.0001013
-
Chen, Haosen / Hou, Lei / Zhang, Guomin (Kevin) / Moon, Sungkon (2021): Development of BIM, IoT and AR/VR technologies for fire safety and upskilling. Dans: Automation in Construction, v. 125 (mai 2021).
https://doi.org/10.1016/j.autcon.2021.103631
-
Moon, Sungkon / Ham, Namhyuk / Kim, Sungjin / Hou, Lei / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building. Dans: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).
https://doi.org/10.1108/ecam-07-2018-0312
-
Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2020): Optimal BIM staffing in construction projects using a queueing model. Dans: Automation in Construction, v. 113 (mai 2020).
https://doi.org/10.1016/j.autcon.2020.103123
-
Ding, Zhikun / Fan, Ze / Tam, Vivian W. Y. / Bian, Yu / Li, Shenghan / Illankoon, I. M. Chethana S. / Moon, Sungkon (2018): Green building evaluation system implementation. Dans: Building and Environment, v. 133 (avril 2018).
https://doi.org/10.1016/j.buildenv.2018.02.012
-
Zekavat, Payam R. / Moon, Sungkon / Bernold, Leonhard E. (2015): Holonic Construction Management: Unified Framework for ICT-Supported Process Control. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 1 (janvier 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000316
-
Lopez, Robert / Chong, Heap-Yih / Moon, Sungkon / Wang, Xiangyu (2017): Case Study on Subcontracting Arrangements in the Scaffolding Supply Chain of A Liquefied Natural Gas Infrastructure Project. Dans: Journal of Civil Engineering and Management, v. 23, n. 8 (novembre 2017).
https://doi.org/10.3846/13923730.2017.1388277
-
Moon, Sungkon / Forlani, John / Wang, Xiangyu / Tam, Vivian (2016): Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 4 (octobre 2016).
https://doi.org/10.1061/(asce)ei.1943-5541.0000287
-
Bhatia, Angat P. S. / Lopez, Robert / Moein, Tania / Chon, James W. M. / Moon, Sungkon (2019): Integrated System for Concrete Curing Monitoring: RFID and Optical Fiber Technologies. Dans: Journal of Materials in Civil Engineering (ASCE), v. 31, n. 3 (mars 2019).
https://doi.org/10.1061/(asce)mt.1943-5533.0002622
-
Hou, Lei / Zhao, Chuanxin / Wu, Changzhi / Moon, Sungkon / Wang, Xiangyu (2017): Discrete Firefly Algorithm for Scaffolding Construction Scheduling. Dans: Journal of Computing in Civil Engineering, v. 31, n. 3 (mai 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000639
-
Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2015): Dynamic Control of Construction Supply Chain to Improve Labor Performance. Dans: Journal of Construction Engineering and Management, v. 141, n. 6 (juin 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000970
-
Moon, Sungkon / Zekavat, Payam R. / Bernold, Leonhard E. (2017): Dynamic Quality Control of Process Resource to Improve Concrete Supply Chain. Dans: Journal of Construction Engineering and Management, v. 143, n. 5 (mai 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001270
-
Ham, Namhyuk / Moon, Sungkon / Kim, Ju-Hyung / Kim, Jae-Jun (2018): Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001498
-
Zekavat, Payam R. / Moon, Sungkon / Bernold, Leonhard E. (2014): Performance of short and long range wireless communication technologies in construction. Dans: Automation in Construction, v. 47 (novembre 2014).
https://doi.org/10.1016/j.autcon.2014.07.008
-
Atherinis, Daniel / Bakowski, Benjamin / Velcek, Mathew / Moon, Sungkon (2018): Developing and Laboratory Testing a Smart System for Automated Falsework Inspection in Construction. Dans: Journal of Construction Engineering and Management, v. 144, n. 3 (mars 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001439
-
Moon, Sungkon / Xu, Shouzhi / Hou, Lei / Wu, Changzhi / Wang, Xiangyu / Tam, Vivian W. Y. (2018): RFID-Aided Tracking System to Improve Work Efficiency of Scaffold Supplier: Stock Management in Australasian Supply Chain. Dans: Journal of Construction Engineering and Management, v. 144, n. 2 (février 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001432