Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia
Auteur(s): |
Sungkon Moon
John Forlani Xiangyu Wang Vivian Tam |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Professional Issues in Engineering Education and Practice, octobre 2016, n. 4, v. 142 |
Page(s): | 04016008 |
DOI: | 10.1061/(asce)ei.1943-5541.0000287 |
- Informations
sur cette fiche - Reference-ID
10332649 - Publié(e) le:
29.07.2019 - Modifié(e) le:
29.07.2019